Illinois Nutrient Loss Reduction Strategy
None
Recent branch failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#5 |
Changes by Indira Gutierrez Polo
|
#7 |
Changes by Indira Gutierrez Polo
|
2 builds 3 days, 18 hours, 39 minutes |
- Average time to fix a failure: 3 days, 18 hours, 39 minutes
- Average number of builds between fixes: 2 builds
- The longest time taken to fix a failure is 3 days, 18 hours, 39 minutes, from failure starting in build #5.
- The greatest number of builds taken to fix a failure is 2, from failure starting in build #5.