Originals in proposal
1. Update all eddy covariance data from 2008-present using TOVI
| 1/31/2022 |
2. Upload all preliminary processed data to Ameriflux Network for QA/QC | 04/15/2022* Goal is for preliminary data to be online searchable before the renewal is due. |
3. Identify, organize, and upload all ancillary data recommended by Ameriflux to link with flux data | 08/31/2022 |
4. Collate all flux and ancillary data for final submission to Ameriflux | 10/31/2022 |
5. Work with Ameriflux personnel to identify any additional changes/errors before data is fully online | 11/30/2022 |
Actual Process
The original proposal and the actual process are quite different as the project goes on. CABBI team mainly lead by Bethany proposed the modified direction of how the pipeline needs to go. The NCSA team tried to implement the main objective of CABBI team.
- TOVI will not be used
- AmeriFlux site submission is ongoing
- Should be included in the main pipeline
- Should be included in the main pipeline
- The process is ongoing
Final Product
The code for the main pipeline
the code will be present in github
there are several prerequisite datasets to run the pipeline.
Convenience component
there are couple user friendly tool designed to help the user
- enveditor for setting up all the necessary variables for running the pipeline.
- metmerger
Documentaion
there