Brock Angelo
  • Continue work on GLTG Release 1.1
  • Continue work on IMLCZO Release 1.1

IMLCZO: Made progress on parser scripts for IMLCZO. Project is on track for release 1.1 by June 26th (progress report).

GLTG: Submitted bugfix to get builds deploying, updated explore map popups to use the bin endpoint resulting in much faster load times, deployed the featured watershed accordion. All priority issues are complete for this release, and I'm moving onto issues with "Normal" priority. Also on track for release 1.1 by June 26th.

SeaGrant: Met and reviewed all proposed work for next release and added time estimates for my tasks in Sea Grant 2.1. Time estimates appear to be appropriate for my 10% allocation to the project.

Edgar F. Black
  • MSC
    • test the accuracy of a "decision tree" built using data from the Chicago team
  • PEcAn
    • Continue developing web application, enabling it to run remote jobs.
  • MSC
    • After building some "decision trees" using the CNV data from the Chicago team, none of them produced meaningful results.
    • The data being used is comes form 48 subjects and contains 170 features (parameters). It is believed that the lack of meaningful results is related to an excessive number of features (parameters). 
    • The next step is to try a dimensionality reduction technique (Principal Component Analysis).
  • PEcAn
    • Web interface was modified to allow submitting a job (running a model) into a remote host.
      • Pull request was issued including this changes.
      • Pull Request was approved.

 

Mario Felarca  
Rob Kooper
  • PEcAn
    • Work with Edgar/Eugene/Wenxue
    • Deploy latest code to pecan, dap and dap-dev
    • Work on caching NARR data in browndog
  • SEAD
    • Fix import projects
    • Filter based on permissions
  • Clowder
    • Finish deployment to machines
  • Open Source
    • Work on DESDM JIRA
  • PEcAn
    • Increased diskspace for softwareserver-0004 to 4TB
    • Fixed BU database to allow for sync to work again
    • Looked at latest BETY pull requests
  • SEAD
    • Import now works correctly with roles
  • Clowder
    • pull requests
    • deployed to all dev machines
    • Fixed redirects on production machine (still using medici)
  • Open Source
    • Fixed confluence crashes (need to tweak memory params)
    • Imported DESDM JIRA into test server need to do cleanups next
Jong Lee  
Rui Liu
  • Vacation
 
Kenton McHenry
  • BD review response
  • BigData paper
  • HR stuff
  • BD review response drafted
  • HR stuff
Luigi Marini
  • Linked Data support for BrownDog
  • Clowder Documentation
  • SEAD 
    • permission design
    • setup new sprint
  • Earthcube planning for next stage
  • Clowder migration to play 2.4
  • Status
    subtletrue
    colourGreen
    Linked Data support for BrownDog
  • Status
    subtletrue
    colourYellow
    Clowder Documentation
  • Status
    subtletrue
    colourGreen
    SEAD 
    • permission design
    • setup new sprint
  • Status
    subtletrue
    colourGreen
    Earthcube planning for next stage
  • Status
    subtletrue
    colourRed
    Clowder migration to play 2.4

 

Christopher Navarro
  • NIST - conf. calls, review pull requests, cleanup git repo of extraneous projects, get more info about tornado scenario event, bug fixing
  • CyberSEES - GI Venture webinar, see where I can assist on birds eye view app
  • MSR - help Tingting with workflow for web app
  • NIST - conference calls for NIST tasks effecting software development, reviewed several pull requests, fixed bugs with the charting and log view. Started working on NISTCORE branding plugin and setting up the NISTCORE git repository, went through MAEviz JIRA issues with Jong and closed/moved all issues to Ergo
  • CyberSEES - attended GI Venture webinar covering papers and software updates, need to check with Jong to see if there has been much progress besides choosing to move forward with the mockup Brian created
  • MSR - responded to emails from Tingting who is trying to execute an NLDAS2 script on the rapid VM, but is running into issues with missing software packages
Michal Ondrejcek
  1. Finish the Data Ingestion, MWRD-114MWRD-116, work on functionality - workflow management and return fields, errors
  2. Finish documentation for the data Ingestion  MWRD-152
  3. prepare slides for our June 9 meeting
  4. Update Technology transfer document
 
  1. The 'Green' design (css, javascript) DONE, 6 mwrd workflows work fine, not transferred to the mwrd VM yet
  2. Not finished
  3. DONE
  4. DONE
Smruti Padhy
  • IEEE Paper
    • use cases section-- need to co-ordinate with Co PIs
    • Elasticity
    • Clients
    • Work with Kenton for other sections editing
  • IEEE Big Data Paper
    • Reviewed previous years paper in the same conference, discussed with Kenton about the type and format and decided on giving less emphasis on use cases, so no need to co-ordinate with use case PIs at this point. Also decided to take picture of our own so that GI,EXIF, opencv and ocr extractors can run on it and show the metadata that as an example in the paper.
    • Elasicity (In Progress) - Based on Rui's reports, compiled the first version of the section, did some literature survey for the context of our work, why one would use our module over other existing solution and for future direction, designing some experiments for the paper and SC Poster. Planning on doing the experiments next week.
    • Started to co-ordinate with Greg for his work for the paper
  • CZ use case meeting with students and Prof. Praveen. It is decided to give priority to the development of DTS service for landsat data and Qina's usecase for the summer. Another meeting with Qina is required.
  • Discussion with Luigi for Json-ld features
Sandeep Puthanveetil Satheesan
  • VAT batch queue extractor tasks
  • Start with text for Groupscope Annual report
  • Fix final couple of issues with person tracking visualization and get started with editing the tracks functionality
  • Completed tasks for running LSVA extractor on batch queue
  • Started running the batch queue extractor on Gordon
  • Cleaned up the extractor code
  • Started with making changes to run the extractor on VAT gateway machine / batch node
Eugene Roeder
  • Try to finalize the controller/HTML unit test cases for clowder
  • Rework merge conflicts for previews and thumbnails
  • Get working Pecan installation and start development on sensitivity and ensemble controls/interface
 
Inna Zharnitsky
  • Tests to addMetadata dn getMetadata for Json-LD sprint
  • Make detailed plans for the next two months, when I will be working remotely
  • Segmentor code
  • Brown Dog report
  • dts extension
  • refactoring of DownloadAs button code as a plugin
 
Marcus Slavenas
  • GLTG - JIRA tasks
  • BD - Functioning handwriting extractor
  • IARP - Research
  • GLTG
    • Changed parsing of parameters and categories - Changed parameters and categories in goedashboard (gltg)
    • removed SUNA_LightAve and SUNA_DarkAve parameters
    • removed QA parameters from LTRM and added units to ids/column headers in parser, changed in geodashboard (gltg)
    • changed date checking for GREON parser
    • Fixed error in GREON parser for missing fields in datapoint
  • BD
    • Finished preliminary handwritten numerals extractor
  • IARP
    • got confluence up
Indira Gutierrez Polo
  • Out of office
 
Jason Votava
  • Transcribe Brown Dog notes
  • Book BD exec meeting/18mo recap
  • BD JIRA audit
  • Edit/review/wordsmith writing samples with Smruti
  • NIST conference calls
  • Work from home Friday
  • Investigate/implement a "JIRA How-To" for NIST-CORE wiki
  • Updated BD documentation
  • Waiting on writing samples, moving to wiki article
  • First full round of teleconferences complete
    • Reviewing results to begin recommending V1 priorities
    • Need final comments for change control
  • Taking notes to improve remote working engagement
Winston Jansz
    • SEAD (Clowder) tickets for new sprint.
  • About to finish a ticket, CATS-7 bugfix–to also add a limit for collections (just like with datasets) on the space page.
  • Having a couple of problems with Thunderbird as an Exchange client (for Outlook mail & calendar) on Linux...
Yong Wook Kim
  • ERGO-127: Inserting execute analysis function in the toolbar
  • ERGO-118: Migrate data in PostGIS database to the new schema
  • Finish custom iterator coding for ERGO tutorial
  • Finished custom iterator coding for ppt tutorial
  • Committed codes for wiki and ppt tutorial to Stash
  • Fixed ERGO-126
  • Fixed ERGO-127
  • Fixed ERGO-133
Omar Elabd
  • Eclipse RCP Tutorials
  • Review ERGO ppt tutorial
  • Fix ERGO-126
  • Out Thursday and Friday
 

...