Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Develop tool: LCCC will develop a tool/algorithm to standardize approaches to calculate nutrient load conditions and trends
  • Nutrient load trend analysis tool developed and tested and documentaiton shared with WFF

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverIdb14d4ad9-eb00-3a94-88ac-a843fb6fa1ca
keyGLGVO-567

Outcome Due: 1/31/2021

  • States Identify Sentinel Sites: In collaboration with HTF’s Trends Work Group, each Mississippi River Basin state will identify at least one sentinel water quality monitoring location and approve it as a measure of progress for the HTF.

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverIdb14d4ad9-eb00-3a94-88ac-a843fb6fa1ca
keyGLGVO-568

Progress Tracking: Due 4/30/2021

  • Develop Dashboard: LCCC will complete the dashboard for network of sentinel sites in the Mississippi River Basin states.
  • Dashboard and storyboard publicly available on site.

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverIdb14d4ad9-eb00-3a94-88ac-a843fb6fa1ca
keyGLGVO-569

Outcome Due: 4/30/2021

  • Sentinel Sites approved and active: The HTF’s web site (or a linked site) will list all sentinel sites and current water quality data (as available) from those sites.
  • Sites and current data are approved, by representatives of states, and go live on the web.

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverIdb14d4ad9-eb00-3a94-88ac-a843fb6fa1ca
keyGLGVO-570

Task C: Developing Data platform for BMPs surveys working with Prof. Reid Christianson

...