...
- Develop tool: LCCC will develop a tool/algorithm to standardize approaches to calculate nutrient load conditions and trends
- Nutrient load trend analysis tool developed and tested and documentaiton shared with WFF
Jira |
---|
server | JIRA |
---|
columns | key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution |
---|
serverId | b14d4ad9-eb00-3a94-88ac-a843fb6fa1ca |
---|
key | GLGVO-567 |
---|
|
Outcome Due: 1/31/2021
- States Identify Sentinel Sites: In collaboration with HTF’s Trends Work Group, each Mississippi River Basin state will identify at least one sentinel water quality monitoring location and approve it as a measure of progress for the HTF.
Jira |
---|
server | JIRA |
---|
columns | key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution |
---|
serverId | b14d4ad9-eb00-3a94-88ac-a843fb6fa1ca |
---|
key | GLGVO-568 |
---|
|
Progress Tracking: Due 4/30/2021
- Develop Dashboard: LCCC will complete the dashboard for network of sentinel sites in the Mississippi River Basin states.
- Dashboard and storyboard publicly available on site.
Jira |
---|
server | JIRA |
---|
columns | key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution |
---|
serverId | b14d4ad9-eb00-3a94-88ac-a843fb6fa1ca |
---|
key | GLGVO-569 |
---|
|
Outcome Due: 4/30/2021
- Sentinel Sites approved and active: The HTF’s web site (or a linked site) will list all sentinel sites and current water quality data (as available) from those sites.
- Sites and current data are approved, by representatives of states, and go live on the web.
Jira |
---|
server | JIRA |
---|
columns | key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution |
---|
serverId | b14d4ad9-eb00-3a94-88ac-a843fb6fa1ca |
---|
key | GLGVO-570 |
---|
|
Task C: Developing Data platform for BMPs surveys working with Prof. Reid Christianson
...