Who | Monday - Planned | Friday - Accomplished |
---|
Brock Angelo | - IMLCZO Conference Tuesday-Thursday.
- Prepare presentation for Tuesday
- Meet with ClearCreek team to help integrate their site with Clowder.
| |
Edgar F. Black | - MSC
- Continue draft of AJT Paper
- Exploring options to visualize and analyze images from Chicago team
| |
Rob Kooper | | |
Jong Lee | | |
Rui Liu | - BD: SC15 poster.
- BW: user ticket on using TAU (BWAPPS-1140).
| - BD: SC15 poster, worked closely with Smruti, finished the draft. Working on shortening and polishing it.
- BW: the ticket is done. Need a bit more time to update the user portal with documentation.
|
Kenton McHenry | - Software Server Logs
- HR Stuff
- Tools Catalog deployments
| - Submitted pull request for POL-142 regarding both Polyglot and Software Server logs.
- Cleaned up logs
- Added timestamps, file sizes, and highlighted input/output files
- Preserved command execution logs from stdout/stderr
- Added means of retrieving lots from REST API by adding a .txt to the end of the returned file
- HR Stuff
- Helped with the submission of BD annual report
- Revised BD Fliar
- Drafted ISDA mission/elevator pitch
- Sent text for T2C2 annual report
- Didn't get to Tools Catalog this week
|
Luigi Marini | | |
Christopher Navarro | - CyberSEES - Hackathon Monday - Wednesday
- NIST - tornado analysis, review pull requests, work on updating build server to build with Eclipse Mars
| |
Michal Ondrejcek | - NEXRAD tool DataWolf on MWRD VM, part of MWRD-102, MWRD-103
- Continue with the documentation for the data Ingestion
- Continue on data ingestion design for Stations, MWRD-114
| |
Smruti Padhy | - BD
- SDN
- Heuristics for Flow Classification Algorithm and correctness proof
- Find better way to write kernel debug message
| |
Sandeep Puthanveetil Satheesan | - Final few touches to the XSEDE presentation
- XSEDE conference (Wednesday - Friday)
- Discussion with Virginia about the talk
| |
Eugene Roeder | Seagrant - Load Heidelburg Data
- Load USGS Data
Pecan - Work on requests 482
- Work on requests 353
- Work on requests 453
| |
Inna Zharnitsky | - Adding extractors to spaces.
- Next three weeks on vacation.
| |
Marcus Slavenas | - GLTG - Update production site
- BD - matlab requests library
- IARP - set up clowder
| |
Indira Gutierrez Polo | - SEAD: Updates to the create dataset page
- CyberSEES: Hackathon monday through wednesday
| |
Jason Votava | - Submit Brown Dog annual report draft for approval
- Make final revisions, if any
- Catch up on 1-1s
- Adjust MWRD meeting schedule
- Prepare NIST onboarding materials
- Follow up with PA about Brown Dog flier
| - Brown Dog annual report submitted
- MWRD reschedule completed
- Drafting of BD intro/quick reference flier in progress
- NIST-CORE monthly reporting completed
- GLTG meeting schedule to be updated this afternoon
|
Winston Jansz | | |
Yong Wook Kim | - Fixing Geotools-update problems
- ERGO-229,230,231,232,233,235,236,237
| - Tornado path code compatible for geotools 2.4
- ERGO-229
- ERGO-232
- ERGO-233
- ERGO-235
|
Omar Elabd | | |
Yan Zhao | | |