Who | Monday - Planned | Friday - Accomplished |
---|
Brock Angelo | - Update Clowder's IMLCZO branch to latest develop - resolve merge conflicts
- Work with Derek and Allison from IMLCZO to update list of sensors in use and planned
- Update JIRA issues for fall IMLCZO release schedule
- Prepare Date-Range slider demo for GLTG
- Continue data cleanup for IMLCZO
- Meet with Marian and Clear Creek team to help implement Clowder uploads
- Address bugs found at last GLTG meeting
| - Met with Clear Creek to discuss uploading files through their UI
- Met with Derek and Allison and got updated list of sensors
- Updated JIRA tasks for next releases
- Researched some design ideas for a date range slider on geodashboard
- Started work on merging develop into the clowder imlczo branch
|
Edgar F. Black | | - MSC (Miami)
- Extractors for the msc web application were updated
- Deeper look into new extractors detected that some issues still remain and are being addressed.
- Drafting of AJT Paper is still underway.
- MSC (Chicago)
- Our section for a short paper they (Chicago team) are preparing was sent on Friday.
|
Rob Kooper | - ISDA/NCSA
- Migrate DESDM to Open Source
- Presentation Friday about docker with Rui Liu
- BD
- experiment with Docker containers
- SEAD
- Create plugin to do publish of curation objects
- PEcAn
| - ISDA/NCSA
- Migrate DESDM to Open Source
- BD
- Create simple docker container for softwareserver
- Linked multiple containers to make single dap server
- SEAD
- Sick (Th, Fr)
|
Jong Lee | | |
Rui Liu | - BD: docker sprint. Friday presentation.
- Earthcube: set up the ecgs production machine. other work.
| - BD: dockerize OCR almost done, doing pull request. dockerize opencv extractors in progress. Helped Inna on tools catalog.
- Earthcube: majority of set up was done. Some manual importing remained. Had a project meeting, and added a landing page draft.
|
Kenton McHenry | - Finished BD-678
- Review BD-728
- Catch up from being sick ...
| - PEcAn report
- HR Stuff
- Review BD-728
|
Luigi Marini | - Clowder documentation
- Earthcube ability to specify jsonld metadata definitions
- BD central authentication design
- IMLCZO planning
- SEAD staging area design
- LSVA content-based index
| - Continued working on clowder landing page
- Got jsonld metadata partially implemented including list of of options from external service (still need to handle cross site)
- Organized IMLCZO JIRA a bit
- Continued refining staging area design
- Begun investigate authentications, keys and user management for BD
|
Christopher Navarro | - NIST - review outstanding pull requests, merge develop-v1 to master, work on locking issue and liquefaction analysis issue
- BD - technical meeting, assist with adding HPC support to pyClowder as necessary (based on KISTI work)
- CyberSEES - continue assisting with september demo work
- MSR - provide required workflow(s) for web app being developed when it's ready
| - NIST - reviewed pull requests so geotools-upgrade could be merged into develop-v1, fixed locking issue with geotools, discussed roadway fragility and restoration implementation with Omar and NIST project researchers, started taking Ethics training required for the project
- BD - technical meeting
- CyberSEES - GI Venture webinar, CyberSEES bi-weekly meeting, meeting with Brian, Indira and Jong to discuss issues integrating Bird view editor.
|
Michal Ondrejcek | - NEXRAD tool DataWolf on MWRD VM, permission problem and speed
- Continue in merging all portals with CSS, JavaScript needs refactoring to make ids and classes unique, task MWRD-158
- Continue on data ingestion design for Stations, MWRD-114
- Start preparing general Documentation
| |
Smruti Padhy | - BD
- Sprint
- JDIQ paper
- Add username/password to the R Library for file upload
- SDN
- Switch model
- Look into the real use case for the flow classification algorithm
- Vacation: Wednesday
| |
Sandeep Puthanveetil Satheesan | - Test editing person-tracks with the help of Students
- Find accuracy of person-tracking using Ground truth data
- Estimate compute time for person-tracking
- Make sure that all Groupscope data / files from Desktop / Laptop is stored in Taub
| - Test editing person-tracks with the help of Students - Started
- Find accuracy of person-tracking using Ground truth data - In progress
- Estimate compute time for person-tracking - In progress
|
Eugene Roeder | Seagrant - Obtain Heidelberg data and load (GEOD- 705)
- Obtain additonal USGS sites data (5 sites total) from STORET and run parser (GEOD-704)
- Post all video scripts for review by Paris and Kirstin
Pecan - Ticket Number 134 - Ensemble Notes enhancement
- Ticket Number 453 - Informative MET names
- Ticket Number 594 - Sensitivity Analysis UI Changes
| |
Inna Zharnitsky | - (first week back after summer break)
- Extractors for spaces - discuss with Luigi, make changes as necessary, make a pull request
- Sprint - I have two JIRA tasks re Tool Catalog
| - Extractors for spaces - code cleaned up, made a pull request
- Tools Catalog - work in progress on BD-724 and BD-727
|
Marcus Slavenas | - IARP
- continue trying to post all images to iarp.ncsa.illinois.edu
- currently, clowder starts returning 500 at about 15,000 images
- BD
- look into adding Tools Catalog Field to "Interface" menu for Docker configuration file
- GLTG
- some front end fixes from michael brennan
- meet with CS team about data visualization
| - IARP
- highly likely identified issue posting images to clowder
- need to index mongo according to change rui has pushed to clowder dev
- BD
- Add fields for docker to edit/show tool - created pull request
- a little bit of working on posting files with BD matlab client
- GLTG
- Text changes to partners page
- disabled checkboxes and labels for sources and parameters search
- pull request rejected - I misunderstood task
- started adding new sensor and several new parameters to USGS parsing
- meet with Michael Brennan to start prep for next weeks presentations
|
Indira Gutierrez Polo | SEAD - Staging area per space pull request feedback
- Fix bugs
MSR - CSS/UI/ JS changes to Rapid UI
| SEAD - Updates to staging area per space based on new mockups
- Fixed some private/public clowder instance issues
- Minor bugs
MSR - CSS/UI/ JS changes to Rapid UI
CyberSEES |
Jason Votava | - Get poster and handouts printed for Brown Dog
- IEEE dry run/final prep
- Several interviews
- Kick-off "Bringing it all together" Brown Dog sprint
- Handle MWRD tech transfer questions/coordination
| - All poster/presentation materials ready to go
- Conference schedule confirmed
- Brown Dog sprint under way
- Setting dates in early October for MWRD tech transfer
- End of month NIST reporting
- GLTG search improvements consensus building
- Out of office next week.
|
Winston Jansz | - Finish CATS-151 (handle timeouts gracefully in spaces, collections, etc).
- Other Clowder tasks (TBD).
| |
Yong Wook Kim | - Fix ERGO geotools-upgrade version bugs
- Search geotools-upgrade bugs
- Fix geotools data lock problem
| - Debugging JIRA Issues
- ERGO-250, 255, 259, 260, 262
- Review Pull Requests
- ERGO-204, 244, 247, 249, 254, 258
- NIST ethics training
|
Omar Elabd | - ERGO-261
- NIST-18
- Setup Computer
| - NIST ethics training
- Roadway Analysis (added fragilities, fragility mapping and base analysis)
|
Yan Zhao | - SEAD
- MSC
- read some paper and test other's code
| - SEAD
- curation form–create on dataset page
- MSC
- read some paper and test other's code
- move code to VM–not finished
|
| | |