Date

Attendees

Agenda:



Discussion items:

2.0 discussion mostly presented by Luigi, Todd, Max.


WhoNotes
Luigi
  • merged many PRs. 
Max
  • next week, plan to demo the workbench integration extractor. explained how it is set up
Mike L.
  • has been reviewing grid view PR, seems to be stringifying JSON in a way that causes high counts, left comments. we can do release now and fix this after merge.

Luigi: look at the tile being used and make sure there aren't additional changes we need to make (see app/views/files/tile.scala.html)

Todd
  • updating PR for the space bytes count, then ready for review
Bing

absent

Mike B.
Rob
  • Fixed auto-deploy problem in industry cluster (yay base64 encoding!)
Michael J

absent

Sandeepabsent
Chen
  • Created pro/cons list for frontend of Clowder for 2.0.
  • PROS - simultaneous development of back and frontend, not as tightly coupled. Easier to implement new design from scratch vs. modifying current view. 
  • REQUIREMENTS - need auth piece, may need JWT or similar token for this for separate frontend. 
  • Previewers - rewriting was cleanest vs. wrapping or porting. Some are easier to duplicate than others.
  • For missing api endpoints or missing parameters or missing content response, need a smooth workflow for doing that. Overall like separate frontend.
Katieabsent
Lisa

absent

Action Items/To Dos: