WhoMonday - PlannedFriday - Accomplished
Brock Angelo 
  • Provided training to ClearCreek on the IMLCZO architecture
  • Helped ClearCreek plan data upload integration
  • Completed the IMLCZO Parser for calculating water elevation of HOBO sensors and deployed to dev and production.
  • Deployed to production several IMLCZO data sets that had been on the develop server for testing.
Edgar F. Black 
  • Vacation
Rob Kooper
  • BD
    • Docker
  • PEcAn
    • Docker writeup
    • CentOS VM
    • qsub
  • NCSA
    • presentation docker Friday
    • Friday afternoon + next week vacation
  • BD
    • Created docker container for Clowder
  • PEcAn
    • CentOS VM
  • NCSA
    • All hands meeting
Jong Lee  
Rui Liu
  • BD: docker sprint: finish dockerize opencv extractors, work on integrate it with elasticity.
  • Earthcube: continue on setting up. other work (likely JSON-LD).
  • BD: docker sprint: finished the 2 dockerization tasks, just started the elasticity work. While doing so, updated the OpenCV extractors with pymedici->pyclowder and other changes, and got them approved and merged.
  • Earthcube:
    • Setting up the production machine: finished all work that can be done. ECGS-12.
    • Helped Mostafa install 3 new extensions in SMW on both dev and prod machines. Resolved ECGS-15.
    • Helped Peishi update and test BMI to his latest code on dev and prod VMs. ECGS-47.
    • Created a landing page on dev and prod VMs. Added a stash repo for it. ECGS-48.
Kenton McHenry
  • PEcAn reports
  • BD-678
  • BD Sprint Pull Requests
  • HR Stuff
  • PEcAn reports
  • BD-678 finished
  • BD Sprint pull request reviews
  • HR Stuff
  • Re-org stuff
Luigi Marini 
  • Reviewed and merged all clowder/clowder pull request omgbbq!
  • Updated clowder landing page
  • CATS-156: Endpoint to retrieve vocabulary definition from remote service to get around cross site requirements.
  • SEAD staging area design sprints
  • Way too many meetings
Christopher Navarro
  • NIST - finish ethics training, test/fix bugs with new geotools upgrade, review email responses to restoration analysis questions
  • BD - technical meeting, assist with adding HPC support to pyClowder as necessary (based on KISTI work)
  • CyberSEES - prepare for next weeks Demo
  • MSR - provide required workflow(s) for web app being developed when it's ready
  • NIST - finished ethics training, reviewed pull requests, looked into issue with roadway analysis low damage values, added bug reports for NIST-CORE/Ergo, reviewed emails regarding roadway restoration analysis
  • BD - tech meeting, met with Jong/Sandeep to discuss HPC support for pyClowder
  • CyberSEES - PI meeting to review demo
Michal Ondrejcek
  1. NEXRAD tool DataWolf on MWRD VM, permission problem, discuss with Rob
  2. Continue in merging all portals (Station mainly) with CSS, JavaScript needs refactoring to make ids and classes unique, task MWRD-158
  3. Finish data ingestion design for Stations, MWRD-114, green design
  4. Continue writing general Documentation
  1. NEXRAD tool DataWolf on MWRD VM does not give correct rain value
  2. Problem with Maps in AJAX call again, combined large html without AJAX works fine
  3. Started, design done, working on restMWRD
  4. yes
Smruti Padhy
  • BD
    • JDIQ paper - decide on different sections, read information loss within polyglot
    • landsat extractor
  • SDN
    • Design Document for Application module for class 1 traffic
    • Survey on topology of smart grid and its impact on version isolation.
  • BD
    • Done with reading Polyglot papers, DFDL and trying to think about the experiments for the paper, pushed the directory to stash with the template tex and Makefile.
    • Started with the Landsat extractor
  • SDN
    • Started with the design document for SDN QoS application module
    • Surveyed the topology of smart grid and proposed a heuristic for flow classification algorithm
Sandeep Puthanveetil Satheesan
  • Brown Dog
    • Come up with a design after discussions with Jong and Chris for adding HPC support to pyClowder - BD-741
  • Decomposing Bodies - Langmead Project
    • Initial discussions
  • Design for adding HPC support to pyClowder - In progress
  • Started with integrating existing HPC implementation from VAT to pyClowder as a prototype
Eugene Roeder  
Inna Zharnitsky
  • Tasks for sprint - Tools Catalog improvements BD-727 and BD-724
  • Both Tools Catalog JIRA issues - done and pull requests approved, merged
  • Found and fixed another bug in Tools Catalog (Main page can be viewed without logging in, "Login"/"Logout"/User name displayed correctly) BD-746
  • Started work on another Tools Catalog issue - behavior of "Revoke"
  • Cleaned up JIRA, closed several old issues.
Marcus Slavenas
  • GLTG
    • prepare and give presentation to UMRBA
    • present clowder file system for greon to scientists
  • IARP
    • Solving speed / indexing problem for uploading lots of files
  • BD
    • complete sprint task
  • GLTG
    • present to umbra, present to water scientists
  • IARP
    • add indexes to mongo
    • help paul with api scripting
  • BD
    • docker sprint: moved interface from tool to tool version, removed docker image field
Indira Gutierrez Polo

SEAD

  • Create ORE page for curation Object
  • Submit curation object for publication

SEAD

  • Create ORE page for curation Object
  • Submit curation object for publication
  • Started adding breadcrumbs to Staging area UI and saving user preferences to model
  • Started looking into how to send data to matchmaker
  • Review and update pull- requests

CyberSEES

  • Read Backbone documentation and working on tutorials
Jason Votava
  • Out of office for IEEE conference
  • Returning to office after Labor Day
Winston Jansz
  • Complete CATS-161 (Changes to the users page for a given dataset or collection; and use tabular presentation).
  • Other Clowder tasks (TBD).
  • Pull request issued for CATS-161.
  • Also completed and issued pull request for CATS-166 (Create a manage users/roles page, with tabs, and move the relevant buttons/functionality from the current space page).
Omar Elabd
  • Roadways Damage Analysis (Damage Ratios and Test Running)
  • Roadways Restoration Analysis
  • Test GeoTools
  • Software Requirements Survey, Final Draft.
  • Out Friday
  • Roadway Damage Analysis Complete
  • Started Roadway Restoration Analysis
Yong Wook Kim
  • Fix ERGO bugs
  • Finish NIST Ethics Training
  • Update Tornado code for Geotools 14
  • Update Tornado plugin (ERGO-265)
  • Fixed ERGO-265
  • Working on ERGO-270
  • Finish Ethics training
Yan Zhao
  • SEAD
    • delete CO
    • edit metadata
  • MSC
    • mscp01 VM
    • detect TLS
  • SEAD
    • delete CO
    • edit metadata
    • CATS-170, CATS-169
  • MSC
    • mscp01 VM
    • detect TLS — not finished