None
Last 25 builds Last 7 days Last 30 days Last 90 days All builds

Recent failures

Failed In Fixed In Time Taken To Fix
#2 Changes by Bing Zhang

#6 Code changes detected

4 builds

2 days, 1 hour, 21 minutes

  • Average time to fix a failure: 2 days, 1 hour, 21 minutes
  • Average number of builds between fixes: 4 builds
  • The longest time taken to fix a failure is 2 days, 1 hour, 21 minutes, from failure starting in build #2.
  • The greatest number of builds taken to fix a failure is 4, from failure starting in build #2.