Core application including web front end
None
Last 25 builds Last 7 days Last 30 days Last 90 days All builds

Recent branch failures

Failed In Fixed In Time Taken To Fix
#1 First build for this plan

#2 Changes by Constantinos Sophocleous

1 build

14 minutes

  • Average time to fix a failure: 14 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 14 minutes, from failure starting in build #1.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #1.