Who | Monday - Planned | Friday - Accomplished |
---|
Brock Angelo | - Prep for the IMLCZO demo on Friday
- Ingest HOBO data
- Assist with the Sensor creation form on Medici
- Any additional UI updates
- Friday afternoon: plan for the SeaGrant meeting on 3/20
| - HOBO Ingestion Script completed
- Friday demo completed with most tasks delivered
- Several UI updates to Geodashboard and Medici Sensor Creation form
|
Dave Mattson | - Continue Planning for 18 month review
- followup with use-cases
- logistics: flights, hotel
- Begin looking at PM presentation
- Employee Evals
| - 18 month review: use-case followup, logistics (all flights are set), working on finances - follow with co-PIs, subs
- Review / edit docs for Jong
- MWRD meeting, discussions re: Chicago / Minsker new requests
- Reviewed RP candidates
|
Edgar F. Black | - Continue working on DFDL schema for MSC spreadsheets
- The XSLT (Extensible Stylesheet Language Transformations) language will be tested as an option to finish the job.
- the idea is to transforming the raw XML document produced by daffodil into other XML document that better suit our needs
- Work on future developments (ideas) for the MSC project.
| - Progress was achieved in the development of XSLT scripts.
- However there still (at least) one issue that stops me from finishing the job.
|
Liana Diesendruck | - Refine river extractor results:
- get better at erasing labels
- create output file in correct format
- Push fix for OCR extractor
- Review pull request for pymedici
| |
Mario Felarca | | |
Rob Kooper | - Finish openstack (quotes and whitepaper)
- Integrate BrownDog into PEcAn
- switch IMLCZO hostnames
- Elasticity spring / deployment
- Testing medici
| - Quotes are being collected
- imlczo migrated
- elasticity deployed
- created softwareserver-0004 (pecan)
- created extractor-0019 (arcgis)
|
Jong Lee | | |
Rui Liu | - Earthcube: work on the user metadata use case, starting from the CSV format.
- Earthcube: work on the model/data matching use case, look into Peishi's files and see how to integrate them into the service
- Elasticity deployment
| - Earthcube – user metadata use case: got named graphs working.
- Earthcube – model matching use case: the team decided that Peishi will work on it.
- Elasticity: OCR extractor image updated and deployed; Softwareserver image updated and deployed – fixed multiple issues there.
|
Luigi Marini | | |
Kenton McHenry | - bd-wget
- refine demo scripts for BD review
- use case tech report
| - Implemented bd command line interface
- Revised BD review agenda
- Revised BD demo scripts
- Added threading to DTS tests
|
Christopher Navarro | - ERGO/NIST - review NIST proposal tasks, discuss next steps with Jong, focus on JIRA tasks
- CyberSEES - finish flow table editor, meeting to discuss GI Notebook architecture
- MSR - NFIE meeting, help debug Rapid issue with Tingting
| - Created a document with Jong to help flesh out NIST Task 1.4
- Worked on Ergo issue with some analyses not creating the result type correctly
- Finished flow table editor, need to discuss next steps with Jong
- Attended NFIE, DataWolf may be used to execute WRF-Hydro, will discuss with Fernando
- Created/tested a workflow for Praveen's use case that executes stream-clip and dem-clip and combines into a single output
|
Michal Ondrejcek | - Finish retrieval of the temperature related data from the database, MWRD-142, MWRD-143, MWRD-144
- Add temperature to the dashboard, MWRD-145
- develop NEXRAD workflow in DataWolf, MWRD-111 and MWRD-112
- look at NetCDF Java for direct conversion of NEXRAD data format to 1) png and 2) Stickney value
| - Done
- Done, the min, mean and max values are in the right pane. better place would be left pane under the storm graph.
- Started working on NEXRAD, The data sets are on rocks which I cannot access (talked to Bruce), backup on my external HD.
- We can use it, we have to implement NEXRAD workflow first.
|
Smruti Padhy | - Finish Critical Zone Use Case DAP Service
- CZ DTS Services
- Revisit Chrome Extension UI
| - Finished two DAP service – DEM and Stream clipper
- Updated Verus Extractor with new RabbitmqURI notation
|
Sandeep Puthanveetil Satheesan | Start work on a person tracking previewer for Groupscope Test person-tracking and person-detection extractor in extractor-0014 machine Go through Groupscope ORM paper reviewer's comments and make a draft of what needs to be done Follow up with XSEDE admins and complete fixing video display issue in Gordon Complete fixing extractor crashing issue in Gordon
| - Started working on a person tracking previewer for Groupscope
- Tested person-detection extractor in extractor-0014 machine
- Went through Groupscope ORM paper reviewer's comments and made a draft of important observations
- Followed up with XSEDE admins once. Need to do it again.
|
Eugene Roeder | - Working on Preview API Test suite
- Start working with developers on Spaces and JSON-LD test logic
| - Wrote Preview Test Suite (working with Rob to find a suitable testing file)
- Talked with Inna and Rob about Spaces and JSON-LD test suite
- Reviewed JSON-LD documentation to gain better idea and context and JSON-LD usage/use cases.
|
Inna Zharnitsky | - DownloadAs button for DTS
- Finish content part of JSON-LD and copy to datasets and collections
| - working on DownloadAs button for DTS
- Some more changes for MMDB-1550 pull request
|
Marcus Slavenas | - Record new virtual tour for Great Lakes to Gulf site and put it into the landing page
- Lots of small fixes to the route/green index and human preference extractors
| - Record new virtual tour for Great Lakes to Gulf site and put it into the landing page
- BD Green infrastructure use case meeting
- nailed down story - got all needed data
- Green Index and Human Preference extractors
- Added block processing of images uploaded by extractors
- improved green index cv by using LAB color space
- added xml verification
- tested/cleaned up multiple route extraction through xml
- tested/tweaked parsers for seagrant noaa and servet
|
Jason Votava | - Continue supporting BD 18 mo review
- Interviews/HR
- Resume 1-1 series
- Update NIST communication plan
| - Curated JIRA tasks
- Presenting Scrum methods to other PMs
- Reviewed staffing needs
- Updated projections for BD 18 mo review
|