Who | Monday - Planned | Friday - Accomplished |
---|
Brock Angelo | - Continue work on SeaGrant issues related to UI updates
- Prepare for October review of IMLCZO
| |
Edgar F. Black | | |
Rob Kooper | - PEcAn
- BD
- use clowder vhost, dts exchange for production services
- SEAD
- optimizations
- import to sharded mongo system
- merge spaces -> develop
| |
Jong Lee | | |
Rui Liu | - BD: Docker design + implementation.
- Earthcube: SAS (semantic annotation service).
| - BD:
- Resolved issues after weekend's power outage. ISL cloud had network issues, re-deployed elasticity to Nebula for dts-dev and dap-dev.
- dap-dev Polyglot test failures: investigated and resolved multiple failures: 1) a wrong SS init state in ISL cloud where the networking was lost and public IP became blank; 2) Polyglot lost RabbitMQ connection, and the jobs could not proceed; 3) Removed the leftover "*.doc" entries in MongoDB, to reduce polyglot's CPU usage. These were because ebook-convert could not convert them.
- Docker: wrote and posted design doc on confluence, and asked team members to review. Started implementation.
- Earthcube: 2 design meetings on SAS, 1 project meeting. Tested Mostafa's API examples using the SAS.py code he wrote, investigated shapefile scala/java/python libraries.
|
Kenton McHenry | - SSA Director profile
- TERRA hire
- NCSA Reorg
- Review Big Data paper
- Review AJT paper
- BD Sprint
| - SSA Director profile
- TERRA hire
- NCSA Reorg/SSA Division
- Edited Big Data paper
- BD Sprint review / organization
|
Luigi Marini | - BD single sign-on prototype - openid connect service
- SEAD staging area sprint 2 - finish cleaning up GUI task
- Clowder documentation
- XSEDE VAT multimedia search bug and speed ups
- XSEDE Roadmap review
- IMLCZO slides for NSF review
- JSON-LD finishing touches - remove old metadata endpoints
- Project spaces pull request
| - IMLCZO slides for NSF review
- Earthcube design meetings
- SEAD staging area reviews and little coding
- Various required training and paperwork
- XSEDE roadmap review
|
Christopher Navarro | - NIST/Ergo - Continue preparing for Ergo user and developer workshop in Greece, review pull requests, bug fixing. Upgrade Ergo build to Mars
- CyberSEES - talk to Rob/Luigi about Clowder/DataWolf users
- BrownDog - tech meeting, work on creating datawolf tools from polyglot log files
- General - in Champaign Tuesday to discuss CyberSEES/BrownDog/NIST
| - NIST - Prepared outline for tutorial (times/topics/presenters) that needs to be finalized, new slides will be needed for additional topics. Reviewed pull requests, upgraded build on master/develop to Mars, fixed bug introduced by Mars upgrade.
- BrownDog - tech meeting, continued work on parsing Polyglot logs to generate DataWolf tools (discussed this with Rob on Tuesday)
- Met with Rob & Luigi to discuss short term and longer term for single sign on (short term, DataWolf can point to Clowder user registration pages, longer term need an approach for BD/DataWolf/Clowder/etc
|
Michal Ondrejcek | - vacation
- Working on the documentation
| |
Smruti Padhy | - BD
- Finalize the Big Data Paper and camera ready submission
- Tool Catalogue sprint
- Landsat extractor - mtl parser
- Travel arrangements for Big Data Conference
- SDN
- Implement SDN QoS Module - Admission Control module
- Wrap up the analysis and update the journal paper draft for the SDN Update
| - BD
- Finished the camera ready version of the IEEE Big Data conference paper and submitted it.
- Had detailed discussion with Marcus, Inna and Inna Jason on Tools levels task in BD sprint
- Had discussion with Sandeep on Rabbitmq insides
- Done with the MTL parser for landsat extractor. Starting putting together all the pieces together
- Flight reservation done for IEEE Big Data
- SDN
- Administration control module – modifying the flow validator
|
Sandeep Puthanveetil Satheesan | - BD
- Continue with design for BD-741
- Decomposing Bodies Project (DEBOD)
- Set up VM
- Go through Census extractor
- Work on quarterly report
- VAT
- Fix running out of memory issue in gateway instance
- Submit quarterly report
| - BD
- Had a detailed discussion with Rob, Jong, Chris and Marcus about pyClowder HPC
- Working on a write up that will be shared soon with the team
- Done some tests with RabbitMQ / extractors to make sure that some design concepts will work
- Decomposing Bodies Project (DEBOD)
- Working with Rob to setup VM
- Census extractor
- Submitted content for the quarterly report
- VAT
- Started fixing running out of memory issue in gateway instance
- Working on quarterly report. Will be submitted today
|
Eugene Roeder | | |
Inna Zharnitsky | - Work on Bringing It All Together 2 - Sprint. BD-674.Tool Catalog, I have several tasks assigned.
| |
Marcus Slavenas | - BD
- IARP
- GLTG
- Continue adding new USGS Sources
| - BD
- Tool Catalog: Edit interface front end so source file, docker file, example input file, and example output file have upload file button next to text field - still need to workon logic of uploading multiple files
- IARP
- Wrote and sent Alan text for quarterly report
- GLTG
- Finished adding new measurements for USGS data to parser
- Added parameters to gltg/geodashboard
|
Indira Gutierrez Polo | SEAD - Continue working on calling matchmaker
- Store published object stubs/placeholders.
CyberSEES - Updates to make Brian's page standalone
| SEAD - Worked on calling matchmaker. Some results displayed on page load. Pending updates with AJAX call.
CyberSEES - Updates to make Brian's page standalone. Updates to index and birdview.html.
|
Jason Votava | - BD
- Start sprint
- update backlog
- review plans for tools catalog front end design
- NIST
- Submit two week update
- Check on survey results
- follow up on travel reimbursement
- GLTG
- Get use case for CS department
- MWRD
- Discuss options for extension/end of project
- NCSA
- Submit eScience trip report
- Follow up on demo plans for SC15
- Get hotel and travel settled for NDS
| - BD
- Print started, tasks described, small group meetings held
- NIST
- Reporting completed, excellent survey results, reimbursement ongoing
- GLTG
- Use case in development. Scientists contacting CS department directly to describe needs
- MWRD
- Will apply for extension after onsite training/install
- NCSA
- Trip report today!
- Demo plans have been settled.
- Travel for NDS completed, hotel when Deanna gets back into office Monday
|
Winston Jansz | | |
Yong Wook Kim | - Finish writing Network discretization code
- Debugging ERGO
| - Finished network discretization coding (ERGO-286, ERGO-289, ERGO-291)
- Debugging ERGO (ERGO-270, ERGO-271, ERGO-273)
|
Omar Elabd | - Roadway Restoration Refactoring
- Roadway Restoration Views
- Find/Fix Roadway Calculation Bug
- RDF
| - Added Roadway Restoration and Dataset Views
- Traced Roadway Calculation Bug
- Sick Tuesday
- Started RDF
- Roadway Small Refactoring
|
Yan Zhao | - SEAD
- CATS-166, 186, 137,189,192
- MSC
- feature extraction in windows
| - SEAD
- CATS-166, 186, 137,189,192
- MSC
- feature extraction in windows
|