You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 31 Next »

WhoMonday - PlannedFriday - Accomplished
Brock Angelo
  • Continue work on SeaGrant issues related to UI updates
  • Prepare for October review of IMLCZO

 

Edgar F. Black  
Rob Kooper
  • PEcAn
    • qsub support
  • BD
    • use clowder vhost, dts exchange for production services
  • SEAD
    • optimizations
    • import to sharded mongo system
    • merge spaces -> develop
 
Jong Lee  
Rui Liu
  • BD: Docker design + implementation.
  • Earthcube: SAS (semantic annotation service).
  • BD: 
    • Resolved issues after weekend's power outage. ISL cloud had network issues, re-deployed elasticity to Nebula for dts-dev and dap-dev.
    • dap-dev Polyglot test failures: investigated and resolved multiple failures: 1) a wrong SS init state in ISL cloud where the networking was lost and public IP became blank; 2) Polyglot lost RabbitMQ connection, and the jobs could not proceed; 3) Removed the leftover "*.doc" entries in MongoDB, to reduce polyglot's CPU usage. These were because ebook-convert could not convert them.
    • Docker: wrote and posted design doc on confluence, and asked team members to review. Started implementation.
  • Earthcube: 2 design meetings on SAS, 1 project meeting. Tested Mostafa's API examples using the SAS.py code he wrote, investigated shapefile scala/java/python libraries.

 

Kenton McHenry
  • SSA Director profile
  • TERRA hire
  • NCSA Reorg
  • Review Big Data paper
  • Review AJT paper
  • BD Sprint
  • SSA Director profile
  • TERRA hire
  • NCSA Reorg/SSA Division
  • Edited Big Data paper
  • BD Sprint review / organization
Luigi Marini
  • BD single sign-on prototype - openid connect service
  • SEAD staging area sprint 2 - finish cleaning up GUI task
  • Clowder documentation
  • XSEDE VAT multimedia search bug and speed ups
  • XSEDE Roadmap review
  • IMLCZO slides for NSF review
  • JSON-LD finishing touches - remove old metadata endpoints
  • Project spaces pull request
  • IMLCZO slides for NSF review
  • Earthcube design meetings
  • SEAD staging area reviews and little coding
  • Various required training and paperwork
  • XSEDE roadmap review
Christopher Navarro
  • NIST/Ergo - Continue preparing for Ergo user and developer workshop in Greece, review pull requests, bug fixing. Upgrade Ergo build to Mars
  • CyberSEES - talk to Rob/Luigi about Clowder/DataWolf users
  • BrownDog - tech meeting, work on creating datawolf tools from polyglot log files
  • General - in Champaign Tuesday to discuss CyberSEES/BrownDog/NIST
  • NIST - Prepared outline for tutorial (times/topics/presenters) that needs to be finalized, new slides will be needed for additional topics. Reviewed pull requests, upgraded build on master/develop to Mars, fixed bug introduced by Mars upgrade.
  • BrownDog - tech meeting, continued work on parsing Polyglot logs to generate DataWolf tools (discussed this with Rob on Tuesday)
  • Met with Rob & Luigi to discuss short term and longer term for single sign on (short term, DataWolf can point to Clowder user registration pages, longer term need an approach for BD/DataWolf/Clowder/etc
Michal Ondrejcek
  1. vacation
  2. Working on the documentation
 
Smruti Padhy
  • BD
    • Finalize the Big Data Paper and camera ready submission
    • Tool Catalogue sprint
    • Landsat extractor - mtl parser
    • Travel arrangements for Big Data Conference
  • SDN
    • Implement SDN QoS Module - Admission Control module
    • Wrap up the analysis and update the journal paper draft for the SDN Update
  • BD
    • Finished the camera ready version of the IEEE Big Data conference paper and submitted it.
    • Had detailed discussion with Marcus, Inna and Jason on Tools levels task in BD sprint
    • Had discussion with Sandeep on Rabbitmq insides
    • Done with the MTL parser for landsat extractor. Starting putting together all the pieces together
    • Flight reservation done for IEEE Big Data
  • SDN
    • Administration control module – modifying the flow validator
Sandeep Puthanveetil Satheesan
  • BD
    • Continue with design for BD-741
  • Decomposing Bodies Project (DEBOD)
    • Set up VM
    • Go through Census extractor
    • Work on quarterly report
  • VAT
    • Fix running out of memory issue in gateway instance
    • Submit quarterly report
  • BD
    • Had a detailed discussion with Rob, Jong, Chris and Marcus about pyClowder HPC
    • Working on a write up that will be shared soon with the team
    • Done some tests with RabbitMQ / extractors to make sure that some design concepts will work
  • Decomposing Bodies Project (DEBOD)
    • Working with Rob to setup VM
    • Census extractor
    • Submitted content for the quarterly report
  • VAT
    • Started fixing running out of memory issue in gateway instance
    • Working on quarterly report. Will be submitted today
Eugene Roeder  
Inna Zharnitsky
  • Work on Bringing It All Together 2 - Sprint. BD-674.Tool Catalog, I have several tasks assigned.
 
Marcus Slavenas
  • BD
    • Tool Catalog tasks
  • IARP
    • Quarterly Report
  • GLTG
    • Continue adding new USGS Sources
  • BD
    • Tool Catalog: Edit interface front end so source file, docker file, example input file, and example output file have upload file button next to text field - still need to workon logic of uploading multiple files
  • IARP
    • Wrote and sent Alan text for quarterly report
  • GLTG
    • Finished adding new measurements for USGS data to parser
    • Added parameters to gltg/geodashboard
Indira Gutierrez Polo

SEAD

  • Continue working on calling matchmaker
  • Store published object stubs/placeholders.

CyberSEES

  • Updates to make Brian's page standalone

SEAD

  • Worked on calling matchmaker. Some results displayed on page load. Pending updates with AJAX call.

CyberSEES

  • Updates to make Brian's page standalone. Updates to index and birdview.html.
Jason Votava
  • BD
    • Start sprint
    • update backlog
    • review plans for tools catalog front end design
  • NIST
    • Submit two week update
    • Check on survey results
    • follow up on travel reimbursement
  • GLTG
    • Get use case for CS department
  • MWRD
    • Discuss options for extension/end of project
  • NCSA
    • Submit eScience trip report
    • Follow up on demo plans for SC15
    • Get hotel and travel settled for NDS
  • BD
    • Print started, tasks described, small group meetings held
  • NIST
    • Reporting completed, excellent survey results, reimbursement ongoing
  • GLTG
    • Use case in development. Scientists contacting CS department directly to describe needs
  • MWRD
    • Will apply for extension after onsite training/install
  • NCSA
    • Trip report today!
    • Demo plans have been settled.
    • Travel for NDS completed, hotel when Deanna gets back into office Monday
Winston Jansz  
Yong Wook Kim
  • Finish writing Network discretization code
  • Debugging ERGO
  • Finished network discretization coding (ERGO-286, ERGO-289, ERGO-291)
  • Debugging ERGO (ERGO-270, ERGO-271, ERGO-273)
Omar Elabd
  • Roadway Restoration Refactoring
  • Roadway Restoration Views
  • Find/Fix Roadway Calculation Bug
  • RDF
  • Added Roadway Restoration and Dataset Views
  • Traced Roadway Calculation Bug
  • Sick Tuesday
  • Started RDF
  • Roadway Small Refactoring
Yan Zhao
  • SEAD
    • CATS-166, 186, 137,189,192
  • MSC
    • feature extraction in windows
  • SEAD
    • CATS-166, 186, 137,189,192
  • MSC
    • feature extraction in windows
  • No labels