Who | Monday - Planned | Friday - Accomplished |
---|
Brock Angelo | - Meet with GLTG to discuss parameter consolidations
- Update IMLCZO sprints and continue progress
- Wednesday meeting with SeaGrant on-site
| |
Edgar F. Black | - MSC
- Drafting of AJT Paper is underway.
- Create repository with AJT Paper to share with other members of the ISDA Team
| | - MSC (Miami)
- Drafting of AJT Paper is still underway.
- Received new PO1 -monitor. HMM analyses were requested by the researchers.
- HMM analyses were sent to the researchers.
- A new modification of the "hidden_markov_model_for_msc.py" script was push to the repository.
- MSC (Chicago)
- Wrote a small section for a short paper they are preparing to send to the AJT. The section written was about some data mining techniques we try in their data.
|
Rob Kooper | - Open Source
- NCSA
- SEAD
- finish food-sec
- Start coding publish plugin
- BD
- Install dap + PEcAn on UMD
- Start working on status page
- PEcAn
| - Open Source
- BD
- DAP + PEcAn installed at UMD and connected to dap-dev on rabbitmq.
- Create docker image of DAP + PEcAn
- SEAD
- PEcAn
| Rob Kooper | |
Jong Lee | | - Ergo Tutorial at NIST
- DO Report
- CS492 project involving Ergo
|
Rui Liu | - BW: finish installing TAU 2.24.1.
- ECGS: finish bmi service installation, and start working on one of the 2:
- set up ecgs, or
- merging external metadata def feature into JSONLD branch.
- BD: elasticity:
- Deployment: Debug intermittent failures at dts-dev and dap-dev. Update the Jira issues Smruti created on elasticity. Look at how easy/difficult to support multiple clouds in one elasticity instance.
- Start working on Docker.
| - BW: finished installing TAU 2.24.1.
- ECGS: finished bmi service installation. Started setting up ecgs (ECGS-12), as part of it, installed gsis service.
- BD: elasticity:
- Deployment: Debugged intermittent failures at dts-dev and dap-dev, made progress and informed Kenton and Rob. Updated the 2 Jira issues Smruti created on elasticity.
- Docker: Created pyclowder-base and OCR docker container, Docker Hub account, pushed pyclowder-base to Docker Hub.
|
Kenton McHenry | - A couple Polyglot log tweaks
- Tools Catalog Sprint
- Parallel longer running Deployment Sprint
- BD Flyer
- BD Video
| - Finished POL-142
- Created BD Tools Catalog Sprint
- Created BD Deployment Sprint
- Finished BD Flyer
- DO Report
- Nearly completed BD-678
- Organizing CS492 involvment
|
Luigi Marini | - BD
- JSONLD agent modifications
- JSONLD search by metadata
- GreatLakesMonitoring meeting at NCSA
- Earthcube external metadata definitions
- SEAD
- Setup staging area sprint 1
- Staging Area selection of datasets
- More meetings to design staging area
- Clowder documentation
| - BD JSONLD agent modifications and search by metadata
- GreatLakesMonitoring meeting at NCSA
- SEAD staging area designs
|
Christopher Navarro | - NIST - preparation for NIST-CORE tutorial, travel to NIST Tuesday/Wednesday, move build to Mars after tutorial
- CyberSEES - continue working on September demo
- BD - technical meeting
| - NIST - prepared for tutorial, traveled Tues/Wed for the tutorial, added JIRA issues based on feedback, created pull request to fix reading .asc files in the develop branch to replace the temp fix for the tutorial
- BD - tech meeting
| | - Gave some thought to POL-142 & POL-29, need to look further to see what changes would be required to DataWolf to support this.
- Helping to prepare plan for CS492 project involving Ergo
- CyberSEES - looked at code from Bardia for the GI performance report that will be generated from a DataWolf workflow. Provided feedback for turning the python script into a DW tool.
|
Michal Ondrejcek | - Finish NEXRAD tool DataWolf on MWRD VM, part of MWRD-102, MWRD-103, permission problems and delete sub-process
- Continue in merging all portals with CSS, JavaScript needs refactoring to make ids and classes unique, task MWRD-158
- Continue on data ingestion design for Stations, MWRD-114
- prepare presentation for August 25 meeting. MWRD-159
| - DONE all but permissions
- Dash plus Ingest on MWRD VM
- No, I haven't touched it this week
- DONE
| Michal Ondrejcek | |
|
Smruti Padhy | - BD
- Finish bd.R library
- BD use case
- eScience practice presentation
- SDN
- MIS algorithms for different graphs
- RYU QoS and Admission control for class 1 traffic
| - Implemented download, Index, Find, Set Distance, compute distance for R Library
- Pushed the library to repository along with examples
- Surveyed MIS algorithms for different graphs
- Started looking into different switch models
|
Sandeep Puthanveetil Satheesan | - Continue with:
- feature for adding new person tracking IDs through UI
- finding the accuracy of person-tracking algorithm (by comparing with ground truth data)
| - Completed feature for adding new tracking IDs through UI
- Tested the current changes
- Other minor additions to person-tracking previewer
|
Eugene Roeder | | |
Inna Zharnitsky | | |
Marcus Slavenas | | | - BD
- continue work on matlab requests library
- IARP
- start extractor for removing black circle from images
- GLTG
- discuss nutrient crosswalk with michael, begin updating parsers
| - BD
- bd-cli-matlab
- getting and posting metadata working
- posting image started but not done
- meet bill sullivan and dongying
- help yicheng (barbara minsker's spin student) using dts-dev
- IARP
- improvements to image fetcher (LOC -> clowder)
- built extractor that gets circle and border artifacts from image (more todo until useful)
- GTLG
- fixed/pushed to new branch edits to sources and parameters in accordion on search page
- more fixes to greon parser: pass by reference of parameters caused faulty removing of parameter keys
- isda meeting about gltg issues
|
Indira Gutierrez Polo | SEAD - Create Staging area per space
CyberSEES - UI Updates
- Avoid Overlapping polygons
MSR - Familiarize with previous code and start making UI modifications.
| SEAD - Create Staging area per space
- Fix bug with 'See other user with access to dataset/collection' when the dataset/collection is not in any space.
CyberSEES MSR - Familiarize with previous code and start making UI modifications.
|
Jason Votava | - Catch up email
- Brown Dog tools sprint lay out
- Brown Dog Flyer printing
- NIST all day meeting 19th
| - Gave presentation to Software Dev group
- Print job submitted, to be received today
- GLTG usability discussion moving forward
- Reviewed Brown Dog materials in prep for IEEE
- NIST all day meeting was fruitful - lots of work from other groups demoed
- Caught up on many one on ones.
- Reviewed MWRD tech transfer documentation
- Describing timeboxing strategies with other PMs this afternoon
- DO Report
|
Winston Jansz | | - Change of plans, per Luigi Marini; working on CATS-151 (handle timeouts gracefully in spaces, collections, etc).
|
Yong Wook Kim | | | | - Vacation
- Bug fix for ERGO geotools-upgrade
- Check pull request
- ERGO-204, ERGO-249, ERGO-254
|
Omar Elabd | - Presentation Review/Preparation
- Travelling to NIST (Tuesday and Wednesday)
- Geotools Testing
- Update JIRA Tickets/Pull Requests
| | | - Presentation Review/Preparation
- NIST Training in D.C.
- Updated ERGO-60 Pull Request
- ERGO-261 (in progress)
- Out Friday Morning
|
Yan Zhao | - SEAD
- MSC
- CRI-86, 89, 82 compete
- CRI-94
| - SEAD
- MSC
- CRI-86, 89, 82 compete
- CRI-94
- background removal with Matlab
| Yan Zhao | | |