Who | Planned - Monday | Accomplished - Friday |
---|
| | |
| | |
| | - BD
- Start work on fence API for datawolf (BD-1195)
- NIST
- Finish creating git repository for python bridge damage example and fleshing out the example
- Code Review
- Ergo
- Answer email from researcher regarding including soil geology in attenuation model
| - BD
- Worked on fence endpoint to call datawolf provenance endpoint
- NIST
- Started working with Jong to create the python library pieces for the bridge damage example. We are creating reusable python libraries that others building analyses would require.
- Started work on the Fragility and Fragility mapping python library parts
- Ergo
- Sent email responding to Ergo questions for including VS 30 and soil types in attenuation models
|
| | |
| - Test Redis dump to selected directory
- Finish draft of web application with 50% of features
| |
| | |
| | |
| - SEAD
- GLM
- Adding popups to the sensors in the new search page
- Download buttons in the new search page
- CyberSEES
- Work on running the GIConverter
| - SEAD
- Update matchmaker page based on review
- Update the contributor role pull request based on review
- GLM
- Adding popups to the sensors in the new search page
- Some work in the download buttons in the new search page
- CyberSEES
- Some work on running the GIConverter
- Meetings with people in UNC to try to see where the issue with the GIConverter is.
|
| sprint | - Fixed and made a pull request - adding labels to fields on the Brown Dog instances (Tool Catalog, Admin interface)
- Fixed pagination error (Tool Catalog, both Admin and general user)
|
| - Distribute jobs on a cluster and do experiments on some tools by Python
- Refactor repository structure based on further discussions
| - Did experiments of a Python package: dispy.
- Refatoring repository is done.
| | | |
| | |
| | | | - BD EC meeting prep
- BD sprint prep
- BD user experience presentation
- BD NSF visit prep
- NDS Report revising/follow up
- Mailing lists follow up
- NDSC6 follow up/invites
- Nebula nodes follow up
- RDA8 follow up
| - BD EC meeting prep
- BD sprint prep
- BD user experience presentation
- BD NSF visit prep
- NDS Report revising/follow up
- Mailing lists follow up
- NDSC6 follow up/invites
- Nebula nodes follow up
- RDA8 follow up
|
| - BD
- SEAD
- IMLCZO
- text for annual report
- czo data manger working group
- Earthcube
- adding new standard name vocabularies
- GLM
- start new sprint
- postresql cache
- search page gui improvements
- Clowder 1.0
| - BD
- started on fence activity logging
- created VM for bd-test
- created bamboo config and services to automatically build and deploy fence
- SEAD
- Got GUI for datasets relationship partially done, still much to do
- IMLCZO
- GLM
- new sprint started
- started looking at stored procedures for postgres
| | | |
| | - GLTG
- made new demo video and editted ngrecc video
- refactoring usgs (parse, gap fill nitrate, gap fill discharge) on prod
- BD
- finish bd-jupyter templates
- start working on adding download jupyter button
|
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| - migrated Terra production to Roger Kilo + performed database maintenance
- pipeline planning call w/ KSU + coordinate initial plan
- extractor work
- created separate repos in GitHub for completed Terra extractors to prep for deployment
- documentation
- Clowder postGIS revision planning
- pull requests
|
| - SEAD - JIRA tasks, finish Image AddedSEAD-1057 - metadata pop-ups randomly stay open and In Review Image AddedSEAD-1108 - Email event setting appears to have no effect . Start SEAD-1036 - Include public and published content on Project Space landing page In Progress.
- MDF - 2016-09-06+Kickoff
- MWRD - create new local VM, update documentation, e-mail to Joe about data
| |
| - Finish Water Network Recovery Analysis
- RDF Server for SandBox
| - Water Network Recovery Analysis
- Finished Restoration and Damage
|
| - LSST
- SEAD
- comments
- medici import script
- PEcAn
- TERRA
| - LSST
- SEAD
- checked on SEAD servers data
- PEcAn
- TERRA
|
| - DEBOD
- Fixing issues with template matching
- BD
| - DEBOD
- Fixed issues related to thresholding while doing template matching
- Testing the new changes with multiple example images
- BD
- Worked on the Chi analysis code and pull requests.
|
| - Interviews
- Brown Dog sprint management
- proposal input
- 1 on 1s
- TV displays ...
- Coordinate reviews
| - Interviews done - coordinating 2nd round
- Brown Dog mgt - time estimates and burndonws
- Proposal completed - initial prep for presentation if selected
- TV displays are frustrating
- Reviews in progress - 2 turned in - Due by 9/15
- 1 on 1s - ongoing
- preparing PPT presentations for team and SPIN
|
| | - BD
- Finished writing index method to C# Library
- Modify registry added index options to the context menu on right click
- Started working on search methods
- Reviewed Shannon's draft for the conference abstract.
- Started looking into the extractors that need to be refactored.
- SDN
- Literature review of SDN QoS papers
- HR
|
| | - SEAD
- published data page
- review code
- BD
- output file & some refector work for ncsa.msc.diagnosis --merged
- pull request for wrapper – not finished
- check DB on softwareserver-0002 – preparation for BD-1197
|
| - Finish small area estimation plugin
- Migrate the old EpaNet conversion plugin to incore
| - Made a pull request for INCORE1-100
- Finished working on Small Area Estimation plugin
- Finished working on GeometryUtils for the feature union/merge method
- Working on migration of old NIST plugin for EPANet input conversion
| | | |