WhoPlanned - MondayAccomplished - Friday
  
  
  • BD
    • Start work on fence API for datawolf (BD-1195)
  • NIST
    • Finish creating git repository for python bridge damage example and fleshing out the example
    • Code Review
  • Ergo
    • Answer email from researcher regarding including soil geology in attenuation model
  • BD
    • Worked on fence endpoint to call datawolf provenance endpoint
  • NIST
    • Started working with Jong to create the python library pieces for the bridge damage example. We are creating reusable python libraries that others building analyses would require.
    • Started work on the Fragility and Fragility mapping python library parts
  • Ergo
    • Sent email responding to Ergo questions for including VS 30 and soil types in attenuation models
  
  • Test Redis dump to selected directory
  • Finish draft of web application with 50% of features
 
  • SEAD
    • Update pull requests
  • GLM
    • Adding popups to the sensors in the new search page
    • Download buttons in the new search page
  • CyberSEES
    • Work on running the GIConverter
  • SEAD
    • Update matchmaker page based on review
    • Update the contributor role pull request based on review
  • GLM
    • Adding popups to the sensors in the new search page
    • Some work in the download buttons in the new search page
  • CyberSEES
    • Some work on running the GIConverter
    • Meetings with people in UNC to try to see where the issue with the GIConverter is.
  
  • Distribute jobs on a cluster and do experiments on some tools by Python
  • Refactor repository structure based on further discussions
  • Did experiments of a Python package: dispy.
  • Refatoring repository is done.
  
  • BD EC meeting prep
  • BD sprint prep
  • BD user experience presentation
  • BD NSF visit prep
  • NDS Report revising/follow up
  • Mailing lists follow up
  • NDSC6 follow up/invites
  • Nebula nodes follow up
  • RDA8 follow up
  • BD EC meeting prep
  • BD sprint prep
  • BD user experience presentation
  • BD NSF visit prep
  • NDS Report revising/follow up
  • Mailing lists follow up
  • NDSC6 follow up/invites
  • Nebula nodes follow up
  • RDA8 follow up
  • BD
    • fence activity logging
  • SEAD
    • clowder relationships
  • IMLCZO
    • text for annual report
    • czo data manger working group
  • Earthcube
    • adding new standard name vocabularies
  • GLM
    • start new sprint
    • postresql cache
    • search page gui improvements
  • Clowder 1.0
    • test branch
  • BD
    • started on fence activity logging
    • created VM for bd-test
    • created bamboo config and services to automatically build and deploy fence
  • SEAD
    • Got GUI for datasets relationship partially done, still much to do
  • IMLCZO
    • annual report section
  • GLM
    • new sprint started
    • started looking at stored procedures for postgres
  • GLTG
    • videos
    • usgs on prod
  • BD
    • jupyter
  • GLTG
    • made new demo video and editted ngrecc video
    • refactoring usgs (parse, gap fill nitrate, gap fill discharge) on prod
  • BD
    • finish bd-jupyter templates
    • start working on adding download jupyter button

 

  • migrated Terra production to Roger Kilo + performed database maintenance
  • pipeline planning call w/ KSU + coordinate initial plan
  • extractor work
    • created separate repos in GitHub for completed Terra extractors to prep for deployment
    • documentation
  • Clowder postGIS revision planning
  • pull requests
  • SEAD - JIRA tasks, finish SEAD-1057 - metadata pop-ups randomly stay open and In Review SEAD-1108 - Email event setting appears to have no effect  . Start SEAD-1036 - Include public and published content on Project Space landing page In Progress.
  • MDF - 2016-09-06+Kickoff
  • MWRD - create new local VM, update documentation, e-mail to Joe about data
  • Finish Water Network Recovery Analysis
  • RDF Server for SandBox
  • Water Network Recovery Analysis
    • Finished Restoration and Damage
  • LSST
    • RFC
  • SEAD
    • comments
    • medici import script
  • PEcAn
    • FIA 6
  • TERRA
    • VM migration
  • LSST
  • SEAD
    • checked on SEAD servers data
  • PEcAn
    • FIA 6 (not done)
  • TERRA
    • VM migration
  • DEBOD
    • Fixing issues with template matching
  • BD
    • Sprint tasks
  • DEBOD
    • Fixed issues related to thresholding while doing template matching
    • Testing the new changes with multiple example images
  • BD
    • Worked on the Chi analysis code and pull requests.
  • Interviews
  • Brown Dog sprint management
  • proposal input
  • 1 on 1s
  • TV displays ...
  • Coordinate reviews
  • Interviews done - coordinating 2nd round
  • Brown Dog mgt - time estimates and burndonws
  • Proposal completed - initial prep for presentation if selected
  • TV displays are frustrating
  • Reviews in progress - 2 turned in - Due by 9/15
  • 1 on 1s - ongoing
  • preparing PPT presentations for team and SPIN
 
  • BD
    • Finished writing index method to C# Library
    • Modify registry added index options to the context menu on right click
    • Started working on search methods
    • Reviewed Shannon's draft for the conference abstract.
    • Started looking into the extractors that need to be refactored.
  • SDN
    • Literature review of SDN QoS papers
  • HR
 
  • SEAD
    • published data page
    • review code
  • BD
    • output file & some refector work for ncsa.msc.diagnosis --merged
    • pull request for wrapper – not finished
    • check DB on softwareserver-0002 – preparation for BD-1197
  • Finish small area estimation plugin
  • Migrate the old EpaNet conversion plugin to incore
  • Made a pull request for INCORE1-100
  • Finished working on Small Area Estimation plugin
  • Finished working on GeometryUtils for the feature union/merge method
  • Working on migration of old NIST plugin for EPANet input conversion