NCSA Estimation
Pre AmeriFlux publishing
Eddy Pro
- Creating a Master Meteorological Data File ( )
- Processing Raw Flux Data in EddyPro ( )
- Formatting Meteorological Data for Eddypro
- Assembling Dynamic Metadata
pyFluxPro
- Creating the Database ( )
- Formatting the PyFluxPro Control Files ( )
- Primary
- Secondary
- Other
- Running a Flux Database through PyFluxPro ( )
- L1-L3: Processing Single Years
- L4-L6: Processing a Full, or Muti-Year, Dataset (Incomplete)
Publishing to AmeriFlux ( before thanksgiving )
Original Proposal Documentation
Proposed Process
- Reprocess all eddy covariance data on bioenergy feedstocks in Illinois and Florida, including the ‘reference’ agroecosystems
- Upload all data to DOE’s Ameriflux Database.
Proposed Schedule
Key results: | Deadline (mm/yyyy): |
1. Update all eddy covariance data from 2008-present using TOVI | 1/31/2022 |
2. Upload all preliminary processed data to Ameriflux Network for QA/QC | 04/15/2022* Goal is for preliminary data to be online searchable before the renewal is due. |
3. Identify, organize, and upload all ancillary data recommended by Ameriflux to link with flux data | 08/31/2022 |
4. Collate all flux and ancillary data for final submission to Ameriflux | 10/31/2022 |
5. Work with Ameriflux personnel to identify any additional changes/errors before data is fully online | 11/30/2022 |