Agenda

  • Weekly updates
WhoPlan for the week (Monday)Accomplished (Friday)
Dora Cai
  • Continue to work on handling multiple layers, nested metadata in the metadata query interface.
  • Implement the script to load Terra project related metadata definition.
  • Design the API that can query BetyDB from an available image name retrieved from Clowder.
 
Rob Kooper
  • All
    • Danforth meeting
  • Max
    • BETY docker container
  • Yan
    • Spatial image processing
  • All
    • Danforth meeting
  • Rob
    • Autobuild BETY using TRAVIS-CI
  • Max
    • BETY docker container
    • Start globus transfer tracker
  • Yan
    • Start spatial image processing
Kenton McHenry
  • EarthCube proposal
  • NDSC5 Planning
  • MDF endpoint
  • A repository of last resort
  • EarthCube proposal
  • NDSC5 Planning
  • MBDH All Hands prep
  • MDF endpoint
  • A repository of last resort
Michal Ondrejcek
  • start nagios with check_mk for mdf
  • Wednesday Skype meeting with Ben
  • installed on my Ubuntu desktop, configuration
  • Globus endpoint tests, learning the system configuration such as networking and storage, support tickets to Globus support (support@globus.org)
  • discussion about system changes namely moving the endpoint directly to the storage condo
David Raila

NDS-129 - Getting issue details... STATUS Settle/test tools for NDSC tutorial - boot scripts

NDS-142 - Getting issue details... STATUS Refactor NDSLabs github

NDS-144 - Getting issue details... STATUS Implement/Configure/Demo Cluster monitoring tools

NDS-143 - Getting issue details... STATUS Heat template and process for rapid deploy for workshops - NDSC tutorial and MWDH

 
Sara Lambert
  • NDS-134 - Getting issue details... STATUS
    • Last few bugs for GUI / API integration
    • Once stable, will assign to Craig for testing
    • Live Demo: http://141.142.209.154
Kandace Turner  
Craig Willis
  • NDS-127 - Getting issue details... STATUS - documentation, test cases, will assign to Mike for testing?
  • NDS-114 - Getting issue details... STATUS - confirm Google Earth requirements with UND. Hope to have VM for them to review by Weds.
  • NDS-139 - Getting issue details... STATUS - documentation, test cases, define dashboard demo
  • NDS-132 - Getting issue details... STATUS - Main focus
  • NDS-114: Sent preliminary VM image to Anne for review. Waiting for final feedback. Need to finalize Google Earth problem resolution.
  • NDS-127: Very close to feature complete. Still need to complete test cases and documentation. Spent time moving services into Kubernetes (not originally planned) and testing under 1.2.
  • NDS-139: Still need to complete test cases and documentation.
  • NDS-132: Have preliminary implementation. Will meet with Odum team on 3/22 for feedback.
  • Also: split out spec and container github repos; implemented preliminary build and versioning strategy for API server and CLI; created videos;