You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 19
Next »
Who | Monday - Planned | Friday - Accomplished |
---|
Brock Angelo | - Meet with GLTG to discuss parameter consolidations
- Update IMLCZO sprints and continue progress
| |
Edgar F. Black | - MSC
- Drafting of AJT Paper is underway.
- Create repository with AJT Paper to share with other members of the ISDA Team
| |
Rob Kooper | | |
Jong Lee | | |
Rui Liu | - BW: finish installing TAU 2.24.1.
- ECGS: finish bmi service installation, and start working on one of the 2:
- set up ecgs, or
- merging external metadata def feature into JSONLD branch.
- BD: elasticity:
- Deployment: Debug intermittent failures at dts-dev and dap-dev. Update the Jira issues Smruti created on elasticity. Look at how easy/difficult to support multiple clouds in one elasticity instance.
- Start working on Docker.
| |
Kenton McHenry | - A couple Polyglot log tweaks
- Tools Catalog Sprint
- Parallel longer running Deployment Sprint
- BD Flyer
- BD Video
| |
Luigi Marini | - BD
- JSONLD agent modifications
- JSONLD search by metadata
- GreatLakesMonitoring meeting at NCSA
- Earthcube external metadata definitions
- SEAD
- Setup staging area sprint 1
- Staging Area selection of datasets
- More meetings to design staging area
- Clowder documentation
| |
Christopher Navarro | - NIST - preparation for NIST-CORE tutorial, travel to NIST Tuesday/Wednesday, move build to Mars after tutorial
- CyberSEES - continue working on September demo
- BD - technical meeting
| |
Michal Ondrejcek | - Finish NEXRAD tool DataWolf on MWRD VM, part of MWRD-102, MWRD-103, permission problems and delete sub-process
- Continue in merging all portals with CSS, JavaScript needs refactoring to make ids and classes unique, task MWRD-158
- Continue on data ingestion design for Stations, MWRD-114
- prepare presentation for August 25 meeting. MWRD-159
| |
Smruti Padhy | - BD
- Finish bd.R library
- BD use case
- eScience practice presentation
- SDN
- MIS algorithms for different graphs
- RYU QoS and Admission control for class 1 traffic
| |
Sandeep Puthanveetil Satheesan | - Continue with:
- feature for adding new person tracking IDs through UI
- finding the accuracy of person-tracking algorithm (by comparing with ground truth data)
| |
Eugene Roeder | | |
Inna Zharnitsky | | |
Marcus Slavenas | - BD
- continue work on matlab requests library
- IARP
- start extractor for removing black circle from images
- GLTG
- discuss nutrient crosswalk with michael, begin updating parsers
| |
Indira Gutierrez Polo | SEAD - Create Staging area per space
CyberSEES - UI Updates
- Avoid Overlapping polygons
MSR - Familiarize with previous code and start making UI modifications.
| |
Jason Votava | - Catch up email
- Brown Dog tools sprint lay out
- Brown Dog Flyer printing
- NIST all day meeting 19th
| |
Winston Jansz | | |
Yong Wook Kim | | |
Omar Elabd | - Presentation Review/Preparation
- Travelling to NIST (Tuesday and Wednesday)
- Geotools Testing
- Update JIRA Tickets/Pull Requests
| |
Yan Zhao | - SEAD
- MSC
- CRI-86, 89, 82 compete
- CRI-94
| |