Phase 2 load testing

XMLWordPrintableJSON

    • Icon: Task Task
    • Resolution: Fixed
    • Icon: Normal Normal
    • Labs Workbench - Beta
    • None
    • None
    • None
    • NDS Sprint 14

      Created based on NDS-579

      Phase 2: Reach out to ISDA or other on-site developers and NDS stakeholders

      • Participants from Phase 1 along with several others would all access the same cluster simultaneously to generate load equivalent to ~10+ users

      Objectives:

      1. Generate load on the system for a given number of users
      2. Monitor the system's resource utilization using Grafana
        • This will give us a benchmark of the expected "load" on the cluster
      3. Take user feedback regarding general usability of the system under the desired load conditions
        • This will let us know if user performance has degraded due to any stress on the system
      4. Take note of how any node additions / removals affect resource constraint, and to what degree
        • If the system's resources become constrained, add a node to the cluster alleviating the resource constraint
        • If the system is far over-saturated with resources, remove a node from the cluster to simulate a downed node

              lambert8 Sara Lambert
              willis8 Craig Willis
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved:

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0 minutes
                  0m
                  Logged:
                  Time Spent - 4 hours
                  4h