None
Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#1 |
Manual run by Rob Kooper
|
Currently failing |
- Average time to fix a failure: 7 years, 1 week, 3 days, 38 minutes
- Average number of builds between fixes: 8 builds
- The longest time taken to fix a failure is 7 years, 1 week, 3 days, 38 minutes, from failure starting in build #1.
- The greatest number of builds taken to fix a failure is 8, from failure starting in build #1.