Who | Plan for the week (Monday) | Accomplished (Friday) |
---|
Dora Cai | - Figure out how to handle multiple layers, nested metadata in the metadata query interface.
- Figure out how to automate the input process for Terra project related metadata definition.
- Prepare for the NDSC5 demo.
| - Added buttons and validation routines to Improve the user interface for Clowder Metadata Search.
- Had meetings with the Terra team members to discuss the API to cross Clowder and BetyDB.
|
Rob Kooper | - Max
- Create pull request for tools in clowder
- Yan
- Rob
- Create docker containers for clowder
- Scott
| |
Kenton McHenry | | - High Level WBS
- TAC meeting to go over WBS
- NDSC5 Planning/Prep
- EarthCube proposal
|
Michal Ondrejcek | - continue json and xml template, send it to Ben asap
- attend DIBBs Advisory Board Meeting meeting, Mo, 4CeeD front and back ends
| - done
- Advisory Board Meeting, Clowder and system operation discussion (Todd, Steve, Klara), system panel discussion (board)
|
David Raila | Devenv - first cut Kubernetes - incorp 1.2 and weave in NDS-build and devenv Add dashboard to Devenv | Kubernetes 1.2 Mini-workshop for PSi Running promethius |
Sara Lambert | -
NDS-134
-
Getting issue details...
STATUS
- A few more bugs / issues to work out
- Working with Craig to finalize the REST API
-
NDS-136
-
Getting issue details...
STATUS
- I will likely postpone this investigation until after the demo
- Preliminary automatic "soft" refresh (polling)
- Assumes data is immutable - cannot be edited
- Investigate any last pieces we need for the TERRA demo
- tool manager GUI - Max's branch built as a docker image
- tool server - Ensure that we can run our own tool server
- plantcv extractor - Investigate version mismatch
| -
NDS-134
-
Getting issue details...
STATUS
- TERRA Demo Prereqs:
|
Kandace Turner | | |
Craig Willis | - Finalize NDS-127 – testing, documentation, bug fixes
- NDS-114
- Start work on Dataverse/iRods integration for demo
| -
NDS-127
-
Getting issue details...
STATUS
- Have working API/CLI, but still need to finalize test cases and documentation.
-
NDS-114
-
Getting issue details...
STATUS
- Nearly complete base VM setup. Ran into problem with Google Earth system requirements (3D capable graphics card). Need to confirm requirements with UND.
-
NDS-139
-
Getting issue details...
STATUS
- Working ELK stack in project deploy (required forking logspout to make namespace-aware). Still need to document, test and determine dashboard demo
-
NDS-132
-
Getting issue details...
STATUS
- Revised iCat image, working on iCloudBrowser
|