Agenda

  • Weekly updates
WhoPlan for the week (Monday)Accomplished (Friday)
Dora Cai
  • Figure out how to handle multiple layers, nested metadata in the metadata query interface.
  • Figure out how to automate the input process for Terra project related metadata definition.
  • Prepare for the NDSC5 demo.
  • Added buttons and validation routines to Improve the user interface for Clowder Metadata Search.
  • Had meetings with the Terra team members to discuss the API to cross Clowder and BetyDB.
Rob Kooper
  • Max
    • Create pull request for tools in clowder
  • Yan
    • Deploy plantcv
  • Rob
    • Create docker containers for clowder
  • Scott
    • Test changes of BETY
 
Kenton McHenry
  • WBS
  • RDA Matrix
  • High Level WBS
  • TAC meeting to go over WBS
  • NDSC5 Planning/Prep
  • EarthCube proposal
Michal Ondrejcek
  • continue json and xml template, send it to Ben asap
  • attend DIBBs Advisory Board Meeting meeting, Mo, 4CeeD front and back ends
  • done
  • Advisory Board Meeting, Clowder and system operation discussion (Todd, Steve, Klara), system panel discussion (board)
David Raila

Devenv - first cut

Kubernetes - incorp 1.2 and weave in NDS-build and devenv

Add dashboard to Devenv

Kubernetes 1.2

Mini-workshop for PSi
Running promethius 

 

Sara Lambert
  • NDS-134 - Getting issue details... STATUS
    • A few more bugs / issues to work out
    • Working with Craig to finalize the REST API
    • NDS-136 - Getting issue details... STATUS
      • I will likely postpone this investigation until after the demo
      • Preliminary automatic "soft" refresh (polling)
        • Assumes data is immutable - cannot be edited
  • Investigate any last pieces we need for the TERRA demo
    • tool manager GUI - Max's branch built as a docker image
    • tool server - Ensure that we can run our own tool server
    • plantcv extractor - Investigate version mismatch
Kandace Turner 

 

Craig Willis
  • Finalize NDS-127 – testing, documentation, bug fixes
  • NDS-114
  • Start work on Dataverse/iRods integration for demo
  • NDS-127 - Getting issue details... STATUS - Have working API/CLI, but still need to finalize test cases and documentation.
  • NDS-114 - Getting issue details... STATUS - Nearly complete base VM setup. Ran into problem with Google Earth system requirements (3D capable graphics card). Need to confirm requirements with UND.
  • NDS-139 - Getting issue details... STATUS - Working ELK stack in project deploy (required forking logspout to make namespace-aware). Still need to document, test and determine dashboard demo
  • NDS-132 - Getting issue details... STATUS - Revised iCat image, working on iCloudBrowser
  • No labels